Prepare for the Georgia Residential Contractor Exam. Use flashcards, multiple choice questions, detailed hints, and explanations. Achieve success on your licensing exam!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


What setback is mandated for absorption lines from bodies of water?

  1. 15 feet

  2. 50 feet

  3. 10 feet

  4. 25 feet

The correct answer is: 50 feet

The mandated setback for absorption lines from bodies of water is 50 feet. This requirement is crucial for environmental protection and public health. The 50-foot distance helps to minimize the risk of contamination of water sources from nearby wastewater systems. By enforcing this setback, local regulations ensure that the absorption of effluent from septic systems does not interfere with the quality of the water in lakes, rivers, or other bodies of water, thereby protecting aquatic ecosystems and human health. The rationale behind such a significant setback is to maintain a buffer zone that allows for natural filtration and absorption processes, which can significantly lower the likelihood of pollutants reaching water bodies. Moreover, these regulations are typically outlined in state or local health codes, highlighting the importance of adhering to established guidelines in construction practices.